task | description |
---|---|
oro | computes orography |
file | param | description | unit | levels | from | time res. (hr) | grib code | hor. comb. | vert. comb | Comments |
---|---|---|---|---|---|---|---|---|---|---|
oro | Z | orography (surface geopotential) | m2/s2 | 1 | gg | const | 129 | area aver | - | |
Two methodes have been used in old preprocessing to compute geopotential at half levels:
For TM5 we only store the 2D orography (=surface geopotential), full 3D geopotential could be computed online.
The orography is not supposed to change very much, and therefore defined for date 00-00-0000 .
NOTE: the orography is also part of the surface files ...